My long ongoing build of a 1U ESXi server to run CHR on has come to an end, a frustrating end that meant I simply couldn’t live with the noise it was kicking out because of the 40mm fans and constantly comparing it to my massively overpowered i7 mATX fileserver.

As a fairly large change to the home setup I decided to pull apart about 3 of my home servers and rebuild the main storage into the spare N54L and then rebuild the “Node” into an ESXi server to host the CHR. Quad port NIC in the Node and a quick install onto the Crucial M4 128GB and it was up and running, installed the CHR and it’s moving along really well and actually turning about double the traffic capability of what the “older” Xeon was doing!

So a really big shuffle around but now I feel like I’m actually starting to do my i7 some justice and not just using it for a ridiculously overpowered power hungry file server.

Whilst doing the work I had the dog in the cave with me (not that she was much help)