The new PSU has worked so far so it was back up into the attic rack for my R210ii. No other modifications although if it manages a couple of weeks I will most likely look into some Noctua fans to quiet it off a bit. A bit of a tidy up as well removing some old switches and getting the patch panel in line.
One of the next jobs on the list will be to get a “CRS3XX” down into the cave so I can take advantage of some 10GB goodness with failover on 2 of the 3 fibres.